ArmSoM
Illustration of a custom embedded board, compute module and industrial enclosure

ARMSOM OEM / ODM SERVICES

Your next product.
Engineered together.

Custom hardware. Embedded software. A path to production.
Build around your application with the ArmSoM team.

FROM FIRST BRIEFTO PRODUCTION
Custom embedded system · Concept illustration

01 / FIND YOUR STARTING POINT

Three ways to make it yours.

You bring the product requirements.
Together, we choose the right level of customization.

01

PLATFORM CUSTOMIZATION

Adapt what already works.

Start with an existing ArmSoM board and define the configuration, software image and integration requirements for your product.

  • Memory, storage and component options
  • System image and firmware preparation
  • Product identification and packaging needs

For teams building on a proven platform.

Discuss this approach
03

FULL PRODUCT DEVELOPMENT

Build around your brief.

Develop a custom embedded solution from agreed requirements, with hardware, embedded software and production preparation considered together.

  • System architecture and hardware design
  • Software and mechanical integration
  • Prototypes, validation and production handover

For teams taking a new product from idea to production.

Discuss this approach

Scope, feasibility, engineering fees and order quantities are confirmed after reviewing your requirements.

02 / ENGINEERING THE COMPLETE SYSTEM

Beyond the board.

Hardware, software and production decisions work best when they are made together.

01

Hardware architecture

Processor selection, memory and storage planning, power design, schematics and PCB layout.

02

Embedded software

BSP adaptation, boot configuration, device trees, peripheral drivers and system-image preparation.

03

Mechanical integration

Board outline, connector placement, enclosure fit and thermal considerations coordinated with your product design.

04

Prototype validation

Bring-up, functional checks and agreed performance, stability and environmental testing.

05

Compliance coordination

Plan the applicable certification scope and work with external test laboratories as required by the project.

06

Production preparation

DFM review, programming, assembly instructions, quality-control procedures and delivery planning.

Engineering illustration of embedded board bring-up with oscilloscope probes
Board bring-up & validation · Concept illustration

DESIGNED TO BE BUILT

A prototype is a beginning.
A product needs a plan.

Define what success looks like before the first PCB is made. We work from an agreed engineering requirements document, with clear review points from prototype evaluation to production readiness.

Requirements reviewPrototype feedbackDesign sign-offPilot validation
See the development process

04 / FROM BRIEF TO BUILD

Clear milestones.
Shared decisions.

A staged development process gives your team room to evaluate, provide feedback and approve the next step.

REFERENCE TIMELINE

Timings are indicative. Your project schedule is agreed after the requirements review.

Share your project brief ↗
01Define the requirements1–2 weeks

Turn your product brief into a shared engineering plan.

  • Review the application, interfaces, operating environment and commercial goals.
  • Agree the Engineering Requirements Document (ERD), deliverables and schedule.
  • Development begins after scope approval and a 50% NRE payment.
02Build the first prototypes6–8 weeks

Develop the board and the software needed for early evaluation.

  • Create hardware designs and coordinate enclosure work where needed.
  • Prepare the initial system software for bring-up and customer debugging.
  • Evaluate 2–5 prototypes, with sample scope and terms confirmed in the quotation.
03Refine and validate6–8 weeks

Use prototype feedback to improve the complete system.

  • Revise the PCB, mechanics and embedded software against the ERD.
  • Validate function, performance, aging and the agreed environmental requirements.
  • Review results together and resolve outstanding issues before design sign-off.
04Approve the production designAbout 6 weeks

Confirm the final prototype and the agreed production deliverables.

  • Complete final integration and customer acceptance.
  • Coordinate external certification testing where required.
  • Review production readiness and release the agreed hardware and software versions.
05Pilot, then manufactureAbout 6 weeks

Validate the production process before scaling the order.

  • Use a 100-unit pilot run to validate assembly procedures and quality control.
  • Check assembly, test stations, firmware programming and serialization.
  • Standard custom mass-production MOQ: 500 units. Confirm delivery and quantity in the project quotation.

BEFORE WE BEGIN

A few practical questions.

Every project starts with a conversation.

Can we start with an existing ArmSoM product?

Yes. Share the product you are evaluating and the changes you need. We will review whether platform configuration, a custom carrier or a new board design is the appropriate starting point.

What should we prepare before contacting you?

A short product brief is enough to begin the discussion. Include your application, preferred processor or board, key interfaces, operating system, mechanical constraints, expected quantity and target schedule. A PRD or ERD helps us assess the scope in more detail.

What are the MOQ and engineering costs?

For custom mass production, the standard MOQ is 500 units. Development begins with a 50% NRE payment. Engineering cost, sample terms and the applicable order quantity depend on the scope confirmed in your quotation. Standard product purchases follow their store listings.

Are the development times fixed?

No. The stage timings shown here are indicative development ranges. Platform reuse, interface complexity, software work, certification and revision cycles affect the final plan; milestones are agreed after requirements review.

How are design files, software and intellectual property handled?

Define the required deliverables and ownership terms before development starts. Schematics, PCB files, source code, documentation and any confidentiality requirements should be agreed in the project scope and contract.

LET’S MAKE THE NEXT THING

Tell us what
you’re building.

From a platform adjustment to a custom embedded system, share your requirements and we’ll review the next steps together.

A useful first brief includes:

  • Your application and target users
  • Preferred board, processor or form factor
  • Interfaces, operating system and environment
  • Expected quantity and target schedule

Have a PRD, ERD or drawings? Email the files to our team.

Explore what people build with ArmSoM ↗

PROJECT INQUIRY

Let’s start the conversation.

Describe your project in the message field below.

Loading application form…

Your inquiry is sent to ArmSoM. Privacy policy